Overview
The Partners
The Study Process
Budget
Marine Environment
Terrestrial Environment
Constraints
Options
Alignments
Design Considerations
Overview/Early History
Original Plans
Recent History
1995 – Hurricane Felix
2003 – Hurricane Fabian
Public Meeting Presentations
Bridges in Other Countries
Bridges in Bermuda
Existing Causeway
The Development Area
View larger Version
Overview of Immediate Development Area: Identifies perimeter site conditions and design challenges.
Download PDF Version (279K)
Utility Lines Across Study Area: Belco Lines, BTC Lines, Cable Vision Lines and Esso Bermuda Fuel Line.
© Copyright 2006 New Crossings. All rights reserved.