Options

#1 Base Case – Do nothing

  • Repair as damage occurs
  • Accept disruptions caused by breakdown or repair of Long Bird Bridge
  • Accept restrictions on boat traffic to Castle Harbour

#2 Upgrade Existing Causeway

  • Raise existing roadway
  • Widen roadway
  • Straighten roadway at west end
  • Replace Long Bird Bridge

#3 New Crossing in one of four study corridors

  • High level - fixed link to accommodate the majority of marine vessels
  • Low level - with moveable bridge
  • Tunnel

Paradise Island Bridge, Bahamas

High Level (fixed link) Bridge Option:
Paradise Island Bridge, Bahamas.
View larger Version